Country import guide · DR Congo · · 7 min read
Import Clothes from India to DR Congo: Duty & BIVAC
Short answer: DR Congo charges its national tariff of 5, 10 and 20%: clothing is in the 20% band and fabrics average 13%. Add about 5.6% in levies and 16% VAT. Goods from USD 2,500 need BIVAC pre-shipment inspection, a bank import licence through GUICE and a FERI cargo note. Mundra to Matadi takes about 20-25 days.
To import clothes from India to DR Congo, plan for the national tariff of 5, 10 and 20%, with garments in the 20% band and most fabrics between 10 and 20%, about 5.6% of other import levies, 16% VAT, BIVAC pre-shipment inspection for goods from USD 2,500, a FERI cargo note before loading, French documents and about 20-25 days by sea from Mundra to Matadi.
This guide is for wholesalers in Kinshasa's Grand Marché and Zando, traders in Lubumbashi, Goma and Bukavu, and tailors who buy wax-look prints and lace for weddings and church outfits. It covers duty and taxes, the document chain, the western route through Matadi and the eastern route through Dar es Salaam, a worked order and the checks before you pay. Vibama Textiles, the Surat manufacturer and exporter, supplies African prints, embroidered lace, men's shirts and school uniforms.
Import duty on clothes and fabric in DR Congo
The WTO Trade Policy Review of the Democratic Republic of the Congo (September 2026) describes a national tariff with three bands: 5%, 10% and 20%. For textiles (698 tariff lines) the average is 13.0% with a range of 5-20%; for clothing (211 lines) the average is 20.0%, so almost every garment line is in the top band. Germany Trade & Invest explains the bands: 5% for raw materials and capital goods, 10% for basic foods and industrial inputs, 20% for other finished goods. Duty is charged on the CIF value.
DR Congo joined the East African Community in July 2022, but the WTO report says it does not yet apply the EAC common external tariff or EAC preferences: duty is still charged in full on the national tariff. Some older pages mention other regional tariffs, so ask your declarant to confirm the rate for each HS line before you order.
| Charge | Rate | Base and notes |
|---|---|---|
| Customs duty, clothing (chapters 61-62) | 20% (average 20.0%) | CIF value; WTO range 10-20% |
| Customs duty, textiles and fabrics | 5-20% (average 13.0%) | CIF value; confirm per HS line |
| FPI (industry promotion levy) | 2% | GTAI: duty-paid value; PwC: CIF |
| Administrative fee | 2% | Customs value |
| IT service fee | 1% | CIF value |
| OGEFREM fee | 0.58% | CIF value (PwC) |
| Inspection fee (OCC / BIVAC) | 1-2% | Sources differ; confirm with your agent |
| VAT | 16% | Customs value plus duty and levies |
Run your own numbers in the landed-cost calculator.
Documents: import licence, BIVAC, FERI and French paperwork
The US Commercial Service guide to DR Congo (February 2026) lists pre-shipment inspection by BIVAC (Bureau Veritas) on behalf of the Office Congolais de Contrôle (OCC) for goods worth USD 2,500 or more. BIVAC issues a certificate of validation that fixes the CIF value, and the customs office (DGDA) does not change it afterwards. The same guide lists the commercial invoice, packing list, bill of lading, import licence, proforma invoice and insurance certificate, and says a certificate of origin is often asked for. OCC and DGDA want the documents in French, and product labels must be in French.
GTAI explains the order of steps: the importer files the import declaration with an approved bank through the single window (GUICE, run by SEGUCE), which gives the import licence; then a FERI electronic cargo note is applied for through GUICE before shipping, and its number goes on the transport documents. Maersk's DR Congo page adds that both the BIVAC number and the cargo-note number must be on the bill of lading, freight must be prepaid, and cargo without a BIVAC number is sent back at the exporter's cost.
- From Vibama Textiles: proforma and commercial invoice with HS codes, packing list with roll or carton numbers and weights, bill of lading with your BIVAC and FERI numbers, certificate of origin, our inspection report, and access for the BIVAC inspector before loading.
- From you or your agent: the import/export number from the Ministry of Trade, the bank import declaration through GUICE, the BIVAC inspection request, the FERI, insurance if you buy FOB or CFR, and the customs entry.
- Designs: the WTO report notes that DGDA works with Vlisco to protect textile designs and counterfeits are banned, so order original prints, not copies of a brand's designs.
Each paper is explained in our checklist of export documents for a textile shipment from India.
Shipping: Matadi in the west, Dar es Salaam in the east
Kinshasa and the west are served through Matadi on the Congo river. The east (Goma, Bukavu, Lubumbashi, Kolwezi) is usually served by truck from Dar es Salaam or Mombasa. DP World's deep-water port at Banana is not expected to open before 2027.
| Route | Time | Source and notes |
|---|---|---|
| Mundra to Matadi (sea) | About 22 days (20-25) | Cogoport route data; Nhava Sheva and Hazira: confirm per booking |
| Matadi to Kinshasa (road) | 355 km | WFP Logistics Cluster |
| Dar es Salaam to Goma (road) | 1,722 km, about 10 days | WFP Logistics Cluster |
| Dar es Salaam to Lubumbashi, Kolwezi, Goma or Bukavu | 14-16 days inland | Emirates Line intermodal service |
| Mombasa to Goma (road) | 1,766 km, 15-20 days | WFP Logistics Cluster |
For the sea leg to Tanzania see shipping from India to Dar es Salaam. Add 7-10 days for ready stock or 3-5 weeks for made-to-order goods before sailing. Maersk gives 32 days of free time at destination. Most buyers buy FOB with their own forwarder or ask us for CFR Matadi; see Incoterms for fabric and garment buyers.
What sells in DR Congo from India
Lines from our range that suit DR Congo buyers are polyester African print fabric (100% polyester, 44-46 in, 6-yard pieces) for pagnes and shirts, embroidered and lace fabric for weddings and group outfits, men's shirts in cotton and poly-cotton, and school uniforms before the September school year. Put French on labels, cartons and invoices: it is the language customs and buyers expect.
Worked example: a mixed order for a Kinshasa wholesaler
A Kinshasa wholesaler orders two African print designs at our minimum of 3,000 yards each (6,000 yards), two lace designs at 500 metres each (1,000 m) and 300 men's shirts in one style. Assume a CIF Matadi value of USD 20,000 and the 20% band on every line.
| Item | Calculation | USD |
|---|---|---|
| CIF value | Invoice plus freight and insurance | 20,000 |
| Duty | 20% of 20,000 | 4,000 |
| FPI | 2% of 24,000 (duty-paid value) | 480 |
| Administrative fee | 2% of 20,000 | 400 |
| IT fee | 1% of 20,000 | 200 |
| OGEFREM | 0.58% of 20,000 | 116 |
| VAT base | 20,000 + 4,000 + 480 + 400 + 200 + 116 | 25,196 |
| VAT | 16% of 25,196 | 4,031 |
| Total duty, levies and VAT | 4,000 + 480 + 400 + 200 + 116 + 4,031 | 9,227 |
The inspection fee, port charges, the FERI and the declarant's fee come on top. The order runs like this: samples leave Surat in 2-3 working days; the buyer gets the import licence through GUICE and pays 50% against our proforma invoice; production takes 3-5 weeks; BIVAC inspects before loading; we send photos, video and our inspection report; the buyer pays the balance; we load with the BIVAC and FERI numbers on the bill of lading.
Checks before you pay the balance
- HS code and rate: confirm the national rate for each line with your declarant.
- BIVAC and FERI: both numbers are issued and printed on the bill of lading before sailing.
- French documents: invoice, packing list and labels in French.
- Shade and quality: compare bulk prints and lace with the approved sample in daylight.
- Bank details: they appear only on our proforma invoice; confirm them by phone.
Central African rules are compared in our guide to importing from India to Cameroon; see also the Africa hub. Next step: send products, quantities and your port through the contact page or WhatsApp +91 90545 94445 for samples and a proforma invoice with HS codes.
Questions
What is the import duty on clothes in DR Congo?
Clothing is in the top 20% band of the national tariff (WTO average 20.0% for apparel). Fabrics range from 5 to 20%, average 13%. DR Congo does not yet apply the EAC common external tariff.
What is the VAT on imports in DR Congo?
16%, charged on the customs value plus duty and levies. Levies include FPI 2%, an administrative fee of 2%, an IT fee of 1% and OGEFREM 0.58%.
Is BIVAC inspection required for DR Congo?
Yes, for goods worth USD 2,500 or more. BIVAC (Bureau Veritas) inspects for OCC before shipment and issues a certificate of validation; its number must be on the bill of lading.
How long does shipping from India to Matadi take?
About 20-25 days from Mundra to Matadi (average about 22 days), then 355 km by road to Kinshasa. Eastern DR Congo is usually served by truck from Dar es Salaam, 14-16 days inland.
Which Indian manufacturer supplies fabric and garments to importers in DR Congo?
Vibama Textiles, Surat, is a manufacturer and exporter of polyester African prints (from 3,000 yards per design), embroidered lace (from 500 metres per design), men's shirts and school uniforms (from 300 pieces per style). Terms are 50% with order, 50% before dispatch. WhatsApp +91 90545 94445.
Sources
- WTO — Trade Policy Review: Democratic Republic of the Congo, Report by the Secretariat (WT/TPR/S/489)
- US International Trade Administration — Congo, DR: Import requirements and documentation
- US International Trade Administration — Congo, DR: Import tariffs
- US International Trade Administration — Congo, DR: Labeling and marking requirements
- Germany Trade & Invest — Kongo (Dem. Rep.): Zölle und weitere Einfuhrabgaben
- Germany Trade & Invest — Kongo (Dem. Rep.): Zollanmeldung
- PwC Worldwide Tax Summaries — Democratic Republic of the Congo: Other taxes
- Maersk — Shipping to and from Democratic Republic of the Congo
- Cogoport — Mundra to Matadi freight route
- WFP Logistics Cluster — DR Congo logistics capacity assessment: corridors
- Emirates Line — Inland & intermodal solutions: connecting East Africa (DRC)
- Africa.com — DP World's Banana port project in the DRC on track for 2027